- Product Categories
- Plastic track
- Plastic stadium
- Kindergarten plastic track
- Artificial turf
- Plastic basketball court
- Self-knot pattern plastic t..
- Acrylic basketball court
- Friendly Links
- Rubber companies
- Rubber products
- Rubber buy leads
- My business card
- China Business News
- My mobile shop
- 88 Yellow Pages Network
- China trade
- Gold rush
- Cloud Business Network
- Gold rush
- Wood network
- Factory of the world
- Pages 88
- China Building Material
- China trade
- Plastic runway Quote
- Plastic basketball cour..
- Silicon PU plastic bask..
Product Name: | Huaibei manufacturer of silicon PU basketball court |
Published: | 2015-06-15 |
Product Type: | Huaibei manufacturer of silicon PU basketball court |
Product Description: | Shanghai Shun purpose Sports Construction Engineering Co. contracted scope and major products: plastic track, basketball courts plastic, the plastic tennis courts, a plastic track and field, all kinds of silicon PU stadium, badminton courts plastic, the plastic volleyball court, acrylic stadium, artificial turf soccer farm, nursery plastic ground, sports venues fence, lighting facilities, nursery outdoor playground, landscape lawns, all kinds of artificial turf pitch pavement. Ryan plastic basketball court laid firm silicon PU (SPU) as a new type of environmentally stadium surface layer material, has unique advantages, especially the old and new cement foundation for. Silicon PU material better solution cement foundation cracking, back to base and other issues. Especially for the repair of expansion joints basis particularly safe and reliable. More effective solution to the problem may be due to underlying problems brought to the surface from the dark, delamination, cracks. Scientific, professional bilayer structure from the perspective of professional sports to consider, on the basis of the technical characteristics of ball games, so the athletes start easy, fast moving and volatile buffer noxious forces generated during exercise. With good weather and wear, even under ultraviolet light, ozone, rain and high temperatures and poor weather conditions can maintain the bright colors that will not fade, chalking stiff, weak. Because SPU contains a silicone composition, and silicone characteristics not easily dirt, no special maintenance, easy to clean, you can make silicon PU basketball courts, soccer fields and other silicon PU Stadium. First, Ryan construction company laying plastic basketball court Conditions: Temperature: ground temperature is not lower than 5 ℃, not higher than 35 ℃; Humidity: Relative humidity less than 85%; grade: not less than 3: 1000, not more than 5: 1000; Flatness: three meters straightedge height of not more than 3mm; strength: C25 above ground strength must reach. Second, construction tools: 1, concrete cutting machine. (Cutting temperature seam) 2, a mixer, a stirred vessel, scraper. (Course material placement) 3, a knife, a small gray knife, portable grinding machine. (Resurfacing) 4, tape, canvas line, brush, textured paper scribing tool. 5, broom, floor mops, water and other cleaning tools. Ryan plastic basketball court laid the company's third, base surface: smooth (3M ruler error 3mm), strong and solid, no loose floats, clean clean, cut sew a reasonable temperature, the construction process: Surface treatment - cutting V-shaped seam - - polished pickling - Sealant - up water - leveling the ground - Scraping the elastic layer - Scraping reinforcement layer - construction interface agent - construction surface layer - dash - clearance completed. Second, the construction method: 1, open seam temperature: not more than 6 × 8m is a block cutting temperature seam between the original plate and the plate to be cut seam temperature, the temperature of the slit width × depth = 6 × 20mm (at a temperature of seam and not regulatory responsibility seam cut V-shaped groove). 2, pickled polish: wet ground with water, dilute yansuan about 8% of the cleaning surface (sanding process), then rinse with clean water. 3, ground damage and uneven process: patching material (elastic material) M8: sand = 1: 0.5 repair breakage. Ryan plastic basketball court laid Corporation 4, primer: primer A: B after stirring add water stir evenly twice, roll to the base surface, the amount depending on processing farm firmness, generally an amount of about 0.2kg / m2 After the next step can be dry solid construction. 5, caulk: to be cured primer hair compressible foam or rubber granules pressed into seam temperature, make sure the temperature does not protrude fill seam sealing, then brush with a sealant width × thickness = 80 × 1.5mm covering the surface. 6, fill water: elastic material with repair m8: sand = 1: 0.5 Stir, leveling the water at 30 minutes after leveling requirement rain water does not exceed 3mm is qualified. 7, scraping the elastic layer: elastic material m8 (A: B: C) 30: 9: 2, stirring after all, to tooth blade knife to the basal plane, each knife thickness does not exceed 2.0mm, every Scraping together before the interval dryness subject (usually about 10 hours, depending on the scene weather conditions) until the knife to the desired thickness shall prevail. 8, after the elastic layer coating to dry, with the water method to test the flatness of the ground, the water level at the required repair materials up with a rough finishing mill and then scraping the surface portion reinforcing layer. 9, Scraping strengthen screed: elastic material m8 (A: B: C) 30: 9: 2, stirring after all, to tooth blade knife to the base surface, a 1.0mm thick scratch after scratch surface It requires smooth. 10, roll interface agent: interface agent with A: B mixing well after the audience can roll a 6-8 hours before making a face. 11. Scraping the surface layer of wear: fabrics A: B mixing well after adding 0.2 full slip sand mixing evenly applied to strengthen the surface, generally scratch two, the second track slip powder plus 1: 0.05 , (two general amount of about 0.3kg / m2). 12, line (A; B mixing well after use): standard size measurement location, with a canvas line marked line position, and then along the canvas with masking line attached to the court, with a special marking paint evenly with NALSANE After hair brush between two textured paper until the paint is dry to the Masking tear. 13, Ryan Company completed the laying of plastic basketball court cleared. |
Admin>>>
You are the 361350 visitor
Copyright © GuangDong ICP No. 10089450, Shanghai Shun purpose Sports Construction Engineering Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 361350 visitor
Copyright © GuangDong ICP No. 10089450, Shanghai Shun purpose Sports Construction Engineering Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility